spacer
spacer
spacer
spacer
New Integrated Knowledge based approachs to the protection of cultural heritage from Earthquake-induced Risk
Projects


Nahal Harod
Nahal Harod Mills [2007]
Preliminary planning for the conservation and development of the Twin Mill and Qosi Mill.
OrdererThe South Jordan Drainage and River Authority
DurationMay 2007
Implemented by: Arch. Yaara Shaltiel

This project is engaged in conducting a physical survey and compiling a historical and technological documentation of the Twin Mill and Qosi Mill in Nahal Harod. The preliminary planning for the conservation and development of the mills will be carried out in accordance with the results of the survey and documentation.


To view the figures, click on the figure caption
The Twin Mill, view from the southwest. One can see the channel and the aqueduct that conveyed water to the mill.

The Twin Mill, view from the east. Remains of the aruba (penstock) and below it the openings at the level of the water wheel.


site built by tetitu
 Credits